Commercial – Case Study

Project: Design and construct mechanical at Lot 25 – 10 Silkstone Place, Berrinba. Including office and warehouse provisions.

Office A/C: 5 x Fujitsu Ducted systems, 1 x Fujitsu Cassette System. Warehouse A/C: 1 x Fujitsu Wall Split.  Total Project A/C Equipment Capacity: 143kw Total Cooling Capacity.

Office Mechanical Ventilation: 2 x Allvent Gigbox Fans for Ground and first floor WC areas.  Warehouse Ventilation: 3 x Allvent Roof Mounted Exhaust Fans.

Share
Published by
The Team

Recent Posts

Ideal Air Conditioner Temperature For Sleeping | A Year-Round Guide

From chilly winter evenings to scorching summer days, your air conditioner is essential in keeping…

3 weeks ago

How Much Does Air Conditioning Cost To Run | A Detailed Guide

Understanding how much air conditioning costs to run is essential for households—especially with rising energy…

2 months ago

AC Remote Symbols | A Guide To The Most Popular Brands

You’ve sweltered your way through balmy Brisbane summers and shivered during a particularly frosty Westlake…

3 months ago