Deprecated: Required parameter $lineno follows optional parameter $only in /var/www/vhosts/hhaircon.com.au/httpdocs/wp-content/plugins/timber-library/vendor/twig/twig/src/Node/IncludeNode.php on line 25
Commercial - Case Study | Air Conditioning Brisbane | Professional Service | Technicool
Commercial – Case Study

Case Studies, Commercial •

Commercial – Case Study


Principle contract: Corplex (Vic)

Technicool were contracted on a design and construct basis.  The project consisted of Daikin ducted air conditioning systems, serving various office spaces.  Ventilation to amenities and fresh air make up for all office spaces.  The warehouse attached to the offices had a smoke exhaust system installed with an exhaust rate of 50,000I/s.