facebook facebook facebook

Category Archives: Commercial

Commercial – Case Study

The Brook Early Education and Care, Kedron. H&H has recently completed mechanical works for ‘The Brook Early Education and Care’ centre in Kedron. This project saw dilapidated and outdated buildings renewed into a 4,694m2 high-quality child care centre, which will accommodate 220 children and 20+ staff in modern, engaging, safe and practical learning and activity […]

Read More...

Commercial – Case Study

Chermside Library and North Regional Business Centre. H&H have completed mechanical works on the brand-new Chermside Library & North Regional Business Centre, providing the northside community with state-of-the-art library and public space facilities and increased local Council services. This impressive new building is targeting 4-star Greenstar rating, encompassing a 3,500sqm library on ground level, two […]

Read More...

Commercial – Case Study

Project: Design and construct mechanical at Lot 25 – 10 Silkstone Place, Berrinba. Including office and warehouse provisions. Office A/C: 5 x Fujitsu Ducted systems, 1 x Fujitsu Cassette System. Warehouse A/C: 1 x Fujitsu Wall Split.  Total Project A/C Equipment Capacity: 143kw Total Cooling Capacity. Office Mechanical Ventilation: 2 x Allvent Gigbox Fans for […]

Read More...

Commercial – Case Study

Principle contract: Corplex (Vic) H & H were contracted on a design and construct basis.  The project consisted of Daikin ducted air conditioning systems, serving various office spaces.  Ventilation to amenities and fresh air make up for all office spaces.  The warehouse attached to the offices had a smoke exhaust system installed with an exhaust […]

Read More...

Commercial Case Study

BP LARAPINTA (LOGAN TRAVEL CENTRE) PRINCIPLE CONTRACT: BECON CONSTRUCTIONS —  MECHANICAL CONSULTANT: BRT ENGINEERING H & H were contracted to carry out all mechanical works for the BP Travel Centre consisting of a main dining area, 5 tenancies, staff facilities and common amenities. The project consisted of 4 Actron packaged air conditioning systems to the […]

Read More...

Commercial Case Study

This original late 60’s office warehouse located in the city fringe was converted to three floors of office space. With no ceiling space on the middle and upper floor, temperzone high static package units were used. To service the middle floor duct work was run over the exterior of the building and incorporated into the […]

Read More...